Our mechanical expertise was at the heart of this project, delivering a quality installation. The scope included the integration of two advanced VRF systems, comprising 52 Mitsubishi indoor units and BC boxes for each system, ensuring optimal efficiency and climate control. On the rooftop, we installed a cutting-edge heater battery for the main supply air, alongside a VRF heater battery linked to four Mitsubishi split units, all integrated with the BMS for intelligent system management. Supporting works included ductwork, public health pipework, MCWS, and refrigeration infrastructure, executed to the highest standard. Every project we undertake is a collaboration—driven by trust, innovation, and a shared commitment to excellence. From concept to completion, we take pride in transforming complex challenges into remarkable results, building lasting relationships along the way.
Unit 2B Copthall Farm Breakspear Road South, Ickenham, Uxbridge, England, UB10 8HB
Monday To Friday
08:00 AM To 5:00 PM
Book via Phone Call
08000016518
© Copyright 2025 All rights reserved | A C UK Group Ltd